Sign In | Join Free | My udpf.com |
|
Brand Name : SSI-hdcz
Model Number : SSI-1
Certification : mill certificate
Place of Origin : China
MOQ : 1
Price : pending
Payment Terms : L/C, D/A, D/P, T/T, Western Union
Delivery Time : 3 months
Packaging Details : nude
material : carbon steel
paint : Jotun
process : rolled and welled
color : yellow
application : offshore and onshore
product : foundatioln
welding test : NDT
fabricate : manual
Pile foundation and transition piece for offshore wind turbine
The production process flow of the wind power tower is generally as follows: the numerical control cutting machine is used for blanking, and the thick plate needs to be beveled. After the plate is formed by the plate rolling machine, the welding of the inner and outer longitudinal joints is carried out after spot welding, positioning and confirmation. After the roundness inspection, if there is any problem, the secondary roundness is carried out. After the welding of the single section cylinder is completed, the hydraulic group is used to conduct the assembly and spot welding of the roller frame, after the welding of the inner and outer circumferential joints, straightness and other tolerances are checked, and after the flange is welded, After NDT and flatness inspection of welds, sandblasting and painting, internal parts installation and finished product inspection are completed, and then transported to the installation site.
Feature
product | wind power tower |
painting | HEMPEL |
color | yellow |
material | high quiality steel |
application | offshore and onshore |
welding test | NDT |
steel working | welding and inspected |
process | rolled |
![]() |
Carbon Steel Offshore Wind Power Tower NDT Rolled Process Images |